Projects
BADA ENGINEERING ONGOING PROJECT/COMPLETED
S/N 79_7c2397-2a> |
NAME OF THE PROJECT 79_bfc779-b7> |
OWNER OF THE PROJECT 79_31eb69-da> |
EPC COMPANY 79_b04b66-fc> |
PMC/TPI 79_352247-48> |
OUR SCOPE OF WORK 79_58d838-c5> |
STATUS OF PROJECT 79_b141fc-65> |
---|---|---|---|---|---|---|
1. 79_91e669-35> |
BGRL-ODISHA-CGD-PROJECT-10002-10″STEEL GAS PIPELINE LAYING 12KM 79_be9c80-47> |
BHARAT GAS RESOURCES LIMITED 79_8686c1-cb> |
RAMBARAN SINGH APEX PVT LTD 79_745d10-a0> |
MECON LIMITED 79_17cecd-7c> |
Grading, Stringing, welding, coating, trenching, lowering, installation of cold bend, hot pulled bend, Coating, Backfilling, HDD Pulling, tien, ROW Restoration, Hydrotest. 79_814eee-b4> |
COMPLETED 79_74db9b-74> |
2. 79_b1fede-a3> |
BGCL CGD PROJECT MOGRA TO DANKUNI CGD PROJECT 12″ STEEL GAS PIPE LINE -19KM 79_687158-3e> |
BENGAL GAS COMPANY LIMITED 79_b76f27-0a> |
RAMBARAN SINGH APEX PVT LTD 79_253457-eb> |
MECON LIMITED 79_ac8114-61> |
Grading, Stringing, welding, coating, trenching, lowering, installation of cold bend, hot pulled bend, Coating, Backfilling, HDD Pulling, tien, ROW Restoration, Hydrotest 79_3a28ed-5c> |
COMPLETED 79_78d35f-45> |
3. 79_52a267-be> |
16″ STEEL GAS PIPELINE HPCL-CGD JH GA. 12 KM 79_f3df99-ca> |
HINDUSTAN PETROLIUM CORPORATION LIMITED 79_2ddff0-5b> |
USHA CONSTRUCTION 79_9fcdd6-20> |
VCS 79_f7eb40-30> |
Grading, Stringing, welding, coating, trenching, lowe ring, installation of cold bend, hot pulled bend, Coating, Backfilling, HDD Pulling, ti en, ROW Restoration, Hydrotest. 79_87c0b4-6d> |
COMPLETED 79_309cc2-1d> |
4. 79_bb0a47-e5> |
IOCL BARAUNI REFINERY 79_28d44b-78> |
INDIAN OIL CORPORATION LIMITED 79_38c035-59> |
RAMBARAN SINGH APEX PVT LTD 79_7889a6-a7> |
TOYO Engineering 79_192b11-5f> |
Fuel Tank Fabrication by supplying of Manpower 79_6a80be-7a> |
COMPLETED 79_50ee50-e2> |
5. 79_56e45f-e6> |
12″ STEEL GAS PIPELINE HPCL CGD PROJECT WB GA 7KM 79_934e39-6e> |
HINDUSTAN PETROLIUM CORPORATION LIMITED 79_925a3d-1b> |
USHA CONSTRUCTION 79_5923d8-9f> |
TRACTEBEL 79_56333e-a7> |
Grading, Stringing, welding, coating, trenching, lowering, installation of cold bend, hot pulled bend, Coating, Backfilling, HDD Pulling, ti en, ROW Restoration, Hydrotest 79_3abcf3-d0> |
COMPLETED 79_8edfd4-5e> |
6. 79_b03bb6-2b> |
HPCL-WALL AND SHUTTER PAINTING(PETROL STATION & MARKETING) RAJSTHAN 79_1e9844-d3> |
HINDUSTAN PETROLIUM CORPORATION LIMITED 79_040e5d-24> |
BADA ENGINEERING 79_8778cc-0e> |
HINDUSTAN PETROLIUM CORPORATION LIMITED 79_218edd-eb> |
WALL, SHUTTER, PETROL STATION, HPCL DEALAR SHOP PAINTING 79_ab1004-47> |
ON GOING 79_42857f-cf> |
7. 79_184d3a-8e> |
CGD WEST BENGAL 1 ALIPURDU AR PROJECT 4″ ,6″ & 8″ STEEL GAS PIPELINE 56KM 79_14af34-cc> |
BHARAT PETROLIUM CORPORATION LIMITED 79_c04829-ce> |
LIKHITHA INFRASTRUCTURE LIMITED 79_a6a017-c1> |
VCS 79_4790d1-1d> |
Grading, Stringing, welding, coating, trenching, lowering, installation of cold bend, hot pulled bend, Coating, Backfilling, HDD Pulling, ti en, ROW Restoration, SV Valve installation, HDPE, MDPE & Fuel station connection, Hydrotest, Commissioning 79_597d8f-ba> |
ON GOING 79_b2357c-b9> |